Congregation Shomrei Torah
Santa Rosa, California
Shalom Hall and Sanctuary Stained Glass
Project Journal
January 7, 2007
Three panels The third panel is completed and placed along side the others for inspection.
standing the window stopping the window into the frame standing the window frame up
Michelle, David and Mez put a completed panel into a frame and stand the frame up in the vertical position, for the first time.
stabilizing the frame checking out the window Each panel is inspected for the first time, in the light. These panels will have to back flat onto the table to make some changes to a couple of pieces. After these adjustments are made, the panel will be thoroughly cleaned and prepared for installation.

Next