Abraham Heschel Day School
Shirley Levine Beit Midrash Foyer

STAINED GLASS FABRICATION IN PROCESS
June 13, 2003


As the pieces are cut out and returned from the kiln, after bending, assembly begins on the convex form built exactly to the radius of the foyer windows.
A complimentary convex from has been built and awaits the part of the process when the completed assembly will be turned over for finishing of the back side.
A close up of the pieces being leaded together on the convex form
The edge of the window is airbrushed with transparent fire-on enamel in order to render the subtle gradient we desire

 

Copyright ©2003 Plachte-Zuieback Art Glass