Abraham Heschel Day School
Shirley Levine Beit Midrash Foyer

STAINED GLASS FABRICATION IN PROCESS
June 17, 2003


David works on the assembly of the first panel, measuring and cutting the lead caming between each piece of glass
The gradient assembled.
Pieces are placed on steel sheets fabricated with the exact curve of the foyer windows and placed into the kiln and fired to an exact temperature, which cures the paint and shapes the glass
The assembly of the first panel nears completion.

 

Copyright ©2003 Plachte-Zuieback Art Glass