|
|
Congregation
Shaarei Torah
Arcadia, CA
STAINED GLASS FABRICATION IN PROCESS
October 19, 2003
|
|
|
|
|
Assembly
of the Star Window was completed, today. |
Painting
and firing continues on all the panels. Pictured above are
the background pieces from the Tree of Life window, having
been painted, are awaiting their turn in the kiln |
|
|
Background
pieces for the Menorah Window.
|
Michelle
has been working on the text, drawing from the materials
provided by Rabbi, laying out he passages, using the computer,
transferring the designs and cutting the resist. |
|
|
|
|
|