Congregation Shaarei Torah
Arcadia, CA
STAINED GLASS FABRICATION IN PROCESS
October 9, 2003


Thumbnails
Here is the section of window laid out for painting
All six windows have been completely cut out and laid on the tables in the painting studio for the application of the gradient.
 
Each gradient required the ten applications of paint with the airbrush, allowing approximately 20 minutes between coats for drying.
 

 

Copyright ©2003 Plachte-Zuieback Art Glass